Challenge

An analytical laboratory in Sharjah needed a complete gas supply for its instruments. The lab runs ICP, FTIR and GC instruments, a fume hood and other lab equipment. Each one needs its own gases, delivered at the right pressure and purity. The lab needed seven gases in total: argon, oxygen, nitrogen, hydrogen, zero air, helium and fuel gas. Supply also had to keep running while cylinders were being changed. Analytical instruments are sensitive to contamination and pressure swings. So the system had to be clean, leak-tight and easy for lab staff to use every day.

Scope

Reliant Gas Systems delivered a complete laboratory gas distribution system covering:

  • Gas supply for argon, oxygen, nitrogen, hydrogen, zero air, helium and fuel gas
  • Gas changeover at the supply side, so cylinder changes don’t interrupt supply
  • Distribution pipework from the supply to the points of use
  • 20 gas outlets, each with a point-of-use regulator
  • Connections serving the ICP, FTIR, GC, the fume hood and other lab instruments
  • Pressure and leak testing, a gas purity check and handover
High-purity gas system with regulators and stainless steel tubing for laboratory instruments

Solution

We designed the system around the needs of each instrument. Supply-side gas manifolds with changeover keep gas flowing when one cylinder bank runs low and the next takes over. From the supply, distribution lines run to 20 outlets across the lab. Each outlet has a point-of-use regulator, so users can set the exact pressure each instrument needs at the bench.

Pipework was built with stainless steel tube fittings and lab valves suited to high-purity service. That protects the gas quality the ICP, FTIR and GC depend on. Fuel gas and hydrogen were handled as flammable gases, in line with the safety practices set out in our guide to lab gas safety in the UAE. The fume hood supply was connected as part of the same system, so the lab’s whole gas network was delivered by one contractor.

Testing & handover

Before handover, the system was pressure and leak tested to confirm the integrity of the pipework and connections. A gas purity check was then carried out to confirm the gases reaching the outlets were fit for analytical use. The system was then handed over to the laboratory.

Result

The laboratory received a complete, single-contractor gas distribution system serving its ICP, FTIR, GC, fume hood and other instruments. It has 20 regulated outlets and supply-side changeover, and it was handed over after pressure/leak and gas purity checks.

Related: Turnkey solutions · Services · UHP vs HP lab gas piping · Gas cabinets and gas detection

Planning a laboratory gas system?

Tell us your instruments and gases, and we’ll propose a system to match.

Planning a new lab or upgrade?

Talk to our engineers for a free consultation and design.

Scroll to Top
Call Now Button